Journal Call no. | HE8421.C48 |
---|
Article Title | 2.5 Gb/s SDH transmission project starts on Beijing-Shenyang-Harbin trunk system. |
---|
Is Part Of | China telecommunications construction ; v.8, no.2, Apr 1996, p.83. |
---|
Abstract | The work of renovating the Beijing-Shenyang-Harbin optical cable trunk system with the 2.5Gb/s SDH transmission system starts in March 1996 and is scheduled for completion in June, with the overall planning done by the Designing Institute of the Ministry of Post and Telecommunications (MPT) and the construction work to be carried out by the No.1, No.3 and No.4 Construction Bureaus of the MPT. |
---|