PolyU Library
Journal Call no.NA1.A8
Article TitleRMD lift off at CLK.
Is Part OfAsian architect and contractor ; v.26, no.6, Jun 1996, p.14, illus.
AbstractMore than 2,000 square metres of RMD Wallform formwork is being used by Leighton Contractors (Asia) for all vertical reinforced concrete walls throughout construction of underground sections of the Ground Transportation Centre (GTC) at Chek Lap Kok; Hong Kong's replacement airport under construction.