Journal Call no. | TA1.H6 |
---|---|
Article Title | Shui On tops out Ma On Shan. |
Is Part Of | Asia engineer : the journal of the Hong Kong Institution of Engineers ; v.24, no.5, May 1996, p.7-8, illus. |
Abstract | On 11 March 1996, Shui On Building Contractors Limited topped out its Ma On Shan Area 90 Phase 2 project. Shui On is the first contractor in Hong Kong to successfully achieve a six-day fast-track construction cycle for a typical floor of Harmony II blocks in the Ma On Shan Area 90 Phase 2 project. |