Article TitleShui On tops out Ma On Shan.
Is Part OfAsia engineer : the journal of the Hong Kong Institution of Engineers ; v.24, no.5, May 1996, p.7-8, illus.
AbstractOn 11 March 1996, Shui On Building Contractors Limited topped out its Ma On Shan Area 90 Phase 2 project. Shui On is the first contractor in Hong Kong to successfully achieve a six-day fast-track construction cycle for a typical floor of Harmony II blocks in the Ma On Shan Area 90 Phase 2 project.