Article TitleAirport site preparation ahead of schedule / Sesha Sam.
Is Part OfAsia engineer : the journal of the Hong Kong Institution of Engineers ; v.22, no.9, Sep 1994, p.15, +3p., illus.
AbstractNearly 19 months into the 41-month site-preparation contract, 800 hectares, of the 1,248-hectare site at Chek Lap Kok have been created. Virtually all marine mud has been removed and nearly 70 per cent of marine operations achieved.