Journal Call no. | TA1.H6 |
---|---|
Author | Oswald, J. R. |
Article Title | Bridging the Tsing Ma Bridge gap / J.R. Oswald and J. Rieger. |
Is Part Of | Asia engineer : the journal of the Hong Kong Institution of Engineers ; v.24, no.4, Apr 1996, p.15-17, illus. |
Abstract | VAE Aktiengesellschaft, an Austrian company, successfully completed for the Rail Movement Joints (RMJs), for the Lantau Fixed Crossing formed by the Tsing Ma Bridge (TMB), the Ma Wan Viaducts and the Kap Shui Mun cable-stayed bridge. Parameters included a 2.2m gap, a speed of 140 km/h, and an average of 198 trains per day. |