PolyU Library
Journal Call no.TA201.C66
Article TitleTunnel excavation completed.
Is Part OfContractor ; Mar/Apr 1995, p.50, illus.
AbstractMr Duncan Siu, Chief Engineer of the Route 3 Division of the Highways Department has reported that excavation of the Route 3 Cheung Ching tunnel was finished two months ahead of schedule.